Journal of Systems Engineering and Electronics ›› 2023, Vol. 34 ›› Issue (2): 396-407.doi: 10.23919/JSEE.2023.000009
• • 上一篇
收稿日期:
2021-02-15
出版日期:
2023-04-18
发布日期:
2023-04-18
Rongcai WANG1(), Enzhi DONG1(), Zhonghua CHENG1,*(), Qian WANG2()
Received:
2021-02-15
Online:
2023-04-18
Published:
2023-04-18
Contact:
Zhonghua CHENG
E-mail:asd528866@126.com;woailiuxi666@163.com;13143648622@163.com;18003131595@163.com
About author:
Supported by:
. [J]. Journal of Systems Engineering and Electronics, 2023, 34(2): 396-407.
Rongcai WANG, Enzhi DONG, Zhonghua CHENG, Qian WANG. Optimization of extended warranty cost for multi-component systems with economic dependence based on group maintenance[J]. Journal of Systems Engineering and Electronics, 2023, 34(2): 396-407.
"
Plan | | | | | | | | |
1 | 1080 | 1262.88 | 2761.64 | 3538.88 | 2089.13 | 1583.05 | 1729.71 | 12965.29 |
2 | 1260 | 1598.80 | 3710.21 | 5330.73 | 2850.68 | 2059.05 | 2374.30 | 17923.77 |
3 | 1440 | 2098.20 | 4755.04 | 7582.08 | 3994.79 | 2771.83 | 3327.96 | 24529.89 |
4 | 1620 | 2568.40 | 5920.16 | 10080.35 | 5047.97 | 3357.46 | 4392.29 | 31366.62 |
5 | 1800 | 3036.37 | 7054.22 | 12976.19 | 6302.24 | 4048.50 | 5567.00 | 38984.52 |
6 | 1980 | 3418.42 | 8111.05 | 16039.34 | 7578.48 | 4643.20 | 6799.04 | 46589.54 |
7 | 2160 | 3959.25 | 9678.70 | 19772.41 | 9145.25 | 5435.03 | 8396.65 | 56387.28 |
8 | 2340 | 4423.04 | 10975.13 | 23741.97 | 10725.52 | 6128.16 | 9993.73 | 65987.55 |
9 | 2520 | 4867.08 | 12307.81 | 28117.69 | 12549.36 | 6919.01 | 11822.89 | 76583.84 |
10 | 2700 | 5355.42 | 13719.87 | 32913.02 | 14530.84 | 7769.58 | 13927.23 | 88215.96 |
11 | 2880 | 5957.22 | 15216.65 | 38107.82 | 16704.57 | 8646.83 | 16221.34 | 100854.44 |
12 | 3060 | 6443.48 | 16692.19 | 43615.05 | 18772.56 | 9341.08 | 18620.28 | 113484.64 |
13 | 3240 | 6933.19 | 18476.24 | 49877.10 | 21323.74 | 10303.77 | 21332.47 | 128246.51 |
14 | 3420 | 7458.70 | 20192.70 | 56404.36 | 24010.23 | 11299.22 | 24350.95 | 143716.16 |
15 | 3600 | 8020.46 | 22109.14 | 63616.96 | 27008.07 | 12379.89 | 27615.41 | 160749.94 |
"
Plan | | | | | | | | |
1 | 1080 | 216 | 216 | 216 | 216 | 216 | 216 | 216 |
2 | 1260 | 288 | 288 | 288 | 288 | 288 | 288 | 288 |
3 | 1440 | 396 | 252 | 252 | 396 | 252 | 396 | 252 |
4 | 1620 | 468 | 324 | 324 | 324 | 324 | 468 | 324 |
5 | 1800 | 396 | 288 | 288 | 396 | 396 | 396 | 288 |
6 | 1980 | 432 | 324 | 324 | 324 | 324 | 432 | 324 |
7 | 2160 | 504 | 396 | 396 | 396 | 396 | 504 | 396 |
8 | 2340 | 432 | 360 | 432 | 432 | 432 | 432 | 360 |
9 | 2520 | 468 | 324 | 396 | 468 | 468 | 468 | 324 |
10 | 2700 | 504 | 288 | 360 | 432 | 432 | 504 | 288 |
11 | 2880 | 468 | 324 | 324 | 468 | 468 | 468 | 324 |
12 | 3060 | 396 | 396 | 396 | 396 | 396 | 396 | 396 |
13 | 3240 | 432 | 324 | 432 | 432 | 432 | 432 | 324 |
14 | 3420 | 468 | 396 | 396 | 396 | 396 | 468 | 396 |
15 | 3600 | 504 | 324 | 324 | 432 | 432 | 432 | 324 |
"
Plan | | | | | | | |
1 | 1080 | 1262.88 | 2761.64 | 3538.88 | 2089.13 | 1583.04 | 1729.71 |
2 | 1260 | 1598.80 | 3710.21 | 5330.73 | 2850.68 | 2059.05 | 2374.30 |
3 | 1440 | 2443.28 | 4755.04 | 7582.08 | 4618.52 | 2771.83 | 3756.71 |
4 | 1620 | 2250.04 | 5920.16 | 10080.35 | 5047.97 | 3357.46 | 4028.07 |
5 | 1800 | 2868.64 | 7054.22 | 12976.19 | 6030.83 | 3774.27 | 5394.41 |
6 | 1980 | 3272.01 | 8111.05 | 16039.34 | 7578.48 | 4643.20 | 6651.06 |
7 | 2160 | 3940.75 | 9678.70 | 19772.41 | 9145.25 | 5435.03 | 8447.69 |
8 | 2340 | 4487.26 | 10975.13 | 24015.53 | 10972.47 | 6246.93 | 10211.76 |
9 | 2520 | 4616.49 | 12307.81 | 28163.05 | 12157.72 | 6516.96 | 11578.10 |
10 | 2700 | 5643.60 | 13719.87 | 32715.04 | 15504.14 | 8625.78 | 14319.45 |
11 | 2880 | 5823.54 | 15216.65 | 38107.82 | 16605.35 | 8449.27 | 16205.65 |
12 | 3060 | 6443.48 | 16692.19 | 43615.05 | 18772.56 | 9341.08 | 18620.28 |
13 | 3240 | 6924.47 | 18476.24 | 50030.32 | 21469.23 | 10314.58 | 21490.94 |
14 | 3420 | 7508.06 | 20192.70 | 56404.36 | 24010.23 | 11299.22 | 24523.46 |
15 | 3600 | 8673.67 | 22109.14 | 63616.96 | 27076.50 | 12341.18 | 27711.10 |
"
Plan | | | | RC/% | | | RP/% |
1 | 1080 | 12965.29 | 11465.29 | 11.57 | 14965.29 | 13465.29 | 10.02 |
2 | 1260 | 17923.77 | 16423.77 | 8.37 | 20923.77 | 19423.77 | 7.17 |
3 | 1440 | 24529.89 | 23827.47 | 2.86 | 28529.89 | 27827.47 | 2.46 |
4 | 1620 | 31366.62 | 28284.04 | 9.83 | 36366.62 | 33284.04 | 8.48 |
5 | 1800 | 38984.52 | 34798.55 | 10.74 | 44984.52 | 40798.55 | 9.31 |
6 | 1980 | 46589.54 | 42395.14 | 9.00 | 53589.54 | 49395.14 | 7.83 |
7 | 2160 | 56387.28 | 52519.82 | 6.86 | 64387.28 | 60519.82 | 6.01 |
8 | 2340 | 65987.55 | 62409.08 | 5.42 | 74987.55 | 71409.08 | 4.77 |
9 | 2520 | 76583.84 | 70540.13 | 7.89 | 86583.84 | 80540.13 | 6.98 |
10 | 2700 | 88215.96 | 84827.87 | 3.84 | 99215.96 | 95827.87 | 3.41 |
11 | 2880 | 100854.44 | 93808.28 | 6.99 | 112854.44 | 105808.28 | 6.24 |
12 | 3060 | 113484.64 | 105984.64 | 6.61 | 126484.64 | 118984.64 | 5.93 |
13 | 3240 | 128246.51 | 121205.78 | 5.49 | 142246.51 | 135205.78 | 4.95 |
14 | 3420 | 143716.16 | 135538.03 | 5.69 | 158716.16 | 150538.03 | 5.15 |
15 | 3600 | 160749.94 | 152228.55 | 5.30 | 176749.94 | 168228.55 | 4.82 |
1 | SHAHANAGHI K, NOOROSSANA R, JALALI-NAINI S G, et al Failure modeling and optimizing preventive maintenance strategy during two-dimensional extended warranty contracts. Engineering Failure Analysis, 2013, 28, 90- 102. |
2 |
MURTHY D N P, DJAMALUDIN I New product warranty: a literature review. International Journal of Production Economics, 2002, 79 (3): 231- 260.
doi: 10.1016/S0925-5273(02)00153-6 |
3 |
HE Z, WANG D F, HE S G, et al Two-dimensional extended warranty strategy including maintenance level and purchase time: a win-win perspective. Computers & Industrial Engineering, 2020, 141, 106294.
doi: 10.1016/j.cie.2020.106294 |
4 | CHU J, CHINTAGUNTA P K Quantifying the economic value of warranties in the U.S. server market. Marketing Science, 2009, 28 (1): 99- 121. |
5 | SU C, WANG X L A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty. Reliability Engineering & System Safety, 2016, 155, 169- 178. |
6 |
HUANG Y S, HUANG C D, HO J W A customized two-dimensional extended warranty with preventive maintenance. European Journal of Operational Research, 2017, 257 (3): 971- 978.
doi: 10.1016/j.ejor.2016.07.034 |
7 |
TONG P, LIU Z X, MEN F, et al Designing and pricing of two-dimensional extended warranty contracts based on usage rate. International Journal of Production Research, 2014, 52 (21): 6362- 6380.
doi: 10.1080/00207543.2014.940073 |
8 | ZHAO X J, XIE M Using accelerated life tests data to predict warranty cost under imperfect repair. Computers & Industrial Engineering, 2017, 107, 223- 234. |
9 | WANG Y K, LIU Z X, LIU Y L Optimal preventive maintenance strategy for repairable items under two-dimensional warranty. Reliability Engineering & System Safety, 2015, 142, 326- 333. |
10 |
WANG X L, LI L S, XIE M An unpunctual preventive maintenance policy under two-dimensional warranty. European Journal of Operational Research, 2020, 282 (1): 304- 318.
doi: 10.1016/j.ejor.2019.09.025 |
11 |
LI X P, LIU Z X, WANG Y K, et al Optimal burn-in strategy for two-dimensional warranted products considering preventive maintenance. International Journal of Production Research, 2019, 57 (17): 5414- 5431.
doi: 10.1080/00207543.2018.1526419 |
12 |
WU S M, ZUO M J Linear and nonlinear preventive maintenance models. IEEE Trans. on Reliability, 2010, 59 (1): 242- 249.
doi: 10.1109/TR.2010.2041972 |
13 |
PHAM H, WANG H Z Imperfect maintenance. European Journal of Operational Research, 1996, 94 (3): 425- 438.
doi: 10.1016/S0377-2217(96)00099-9 |
14 |
NGUYEN D T, DIJOUX Y, FOULADIRAD M Analytical properties of an imperfect repair model and application in preventive maintenance scheduling. European Journal of Operational Research, 2017, 256 (2): 439- 453.
doi: 10.1016/j.ejor.2016.06.026 |
15 | ZHANG N, FOULADIRAD M, BARROS A Optimal imperfect maintenance cost analysis of a two-component system with failure interactions. Reliability Engineering & System Safety, 2018, 177, 24- 34. |
16 |
MABROUK A B, CHELBI A, RADHOUI M Optimal imperfect preventive maintenance policy for equipment leased during successive periods. International Journal of Production Research, 2016, 54 (17): 5095- 5110.
doi: 10.1080/00207543.2016.1146417 |
17 | DAO C D, ZUO M J Selective maintenance of multi-state systems with structural dependence. Reliability Engineering & System Safety, 2017, 159, 184- 195. |
18 |
THOMAS L C A survey of maintenance and replacement models for maintainability and reliability of multi-item systems. Reliability Engineering, 1986, 16 (4): 297- 309.
doi: 10.1016/0143-8174(86)90099-5 |
19 |
YANG L, ZHAO Y, MA X B Group maintenance scheduling for two-component systems with failure interaction. Applied Mathematical Modelling, 2019, 71, 118- 137.
doi: 10.1016/j.apm.2019.01.036 |
20 |
DINH D H, DO P, IUNG B Degradation modeling and reliability assessment for a multi-component system with structural dependence. Computers & Industrial Engineering, 2020, 144, 106443.
doi: 10.1016/j.cie.2020.106443 |
21 | CHALABI N, DAHANE M, BELDJILALI B, et al Optimisation of preventive maintenance grouping strategy for multi-component series systems: particle swarm based approach. Computers & Industrial Engineering, 2016, 102, 440- 451. |
22 | DAO C D, ZUO M J, PANDEY M Selective maintenance for multi-state series-parallel systems under economic dependence. Reliability Engineering & System Safety, 2014, 121, 240- 249. |
23 |
OLDE KEIZER M C A, FLAPPER S D P, TEUNTER R H Condition-based maintenance policies for systems with multiple dependent components: a review. European Journal of Operational Research, 2017, 261 (2): 405- 420.
doi: 10.1016/j.ejor.2017.02.044 |
24 | ZHOU X J, HUANG K M, XI L F, et al Preventive maintenance modeling for multi-component systems with considering stochastic failures and disassembly sequence. Reliability Engineering & System Safety, 2015, 142, 231- 237. |
25 | CHA J H, FINKELSTEIN M, LEVITIN G On preventive maintenance of systems with lifetimes dependent on a random shock process. Reliability Engineering & System Safety, 2017, 168, 90- 97. |
26 | ZHAO X F, AL-KHALIFA K N, HAMOUDA A M, et al Age replacement models: a summary with new perspectives and methods. Reliability Engineering & System Safety, 2017, 161, 95- 105. |
27 | ZHOU Y F, ZHANG Z S, LIN T R, et al Maintenance optimisation of a multi-state series–parallel system considering economic dependence and state-dependent inspection intervals. Reliability Engineering & System Safety, 2013, 111, 248- 259. |
28 |
DOYLE E K On the application of stochastic models in nuclear power plant maintenance. European Journal of Operational Research, 2004, 154 (3): 673- 690.
doi: 10.1016/S0377-2217(02)00805-6 |
29 |
CHO D I A survey of maintenance models for multi-unit systems. European Journal of Operational Research, 1991, 51 (1): 1- 23.
doi: 10.1016/0377-2217(91)90141-H |
30 | ROKSTAD M M, UGARELLI R M Minimising the total cost of renewal and risk of water infrastructure assets by grouping renewal interventions. Reliability Engineering & System Safety, 2015, 142, 148- 160. |
31 | ZHOU X J, LU Z Q, XI L F Preventive maintenance optimization for a multi-component system under changing job shop schedule. Reliability Engineering & System Safety, 2012, 101, 14- 20. |
32 |
STENGOS D, THOMAS L C The blast furnaces problem. European Journal of Operational Research, 1980, 4 (5): 330- 336.
doi: 10.1016/0377-2217(80)90144-7 |
33 |
KIJIMA M Some results for repairable systems with general repair. Journal of Applied Probability, 1989, 26 (1): 89- 102.
doi: 10.2307/3214319 |
34 |
WANG J H, ZHANG X H, ZENG J C, et al Optimal dynamic imperfect preventive maintenance of wind turbines based on general renewal processes. International Journal of Production Research, 2020, 58 (22): 6791- 6810.
doi: 10.1080/00207543.2019.1685706 |
No related articles found! |
阅读次数 | ||||||
全文 |
|
|||||
摘要 |
|
|||||